Job fail with Timeout for parallel process (for SID Gener.): 006000

Advertisement
November 30

Hello all,
Im getting below error and not able to find any issue with Basis side. Please anyone help on this!
Job started
Data package has already been activated successfully (will be skipped)
Process started
Process started
Process started
Process started
Process started
Import from cluster of the data package to be activated () failed
Process 000001 returned with errors
Process 000002 returned with errors
Process 000003 returned with errors
Process 000004 returned with errors
Background process BCTL_4XU7J1JPLOHYI3Y5RYKD420UL terminated due to missing confirmation
Process 000006 returned with errors
Data pkgs 000001; Added records 1-; Changed records 0; Deleted records 0
Log for activation request ODSR_4XUG2LVXX3DH4L1WT3LUFN125 data package 000001...000001
Errors occured when carrying out activation
Analyze errors and activate again, if necessary
Activation of M records from DataStore object CRACO20A terminated
Activation is running: Data target CRACO20A, from 1,732,955 to 1,732,955
Overlapping check with archived data areas for InfoProvider CRACO20A
Data to be activated successfully checked against archiving objects
Parallel processes (for Activation); 000005
Timeout for parallel process (for Activation): 006000
Package size (for Activation): 100000
Task handling (for Activation): Backgr Process
Server group (for Activation): No Server Group Configured
Parallel processes (for SID Gener.); 000002
Timeout for parallel process (for SID Gener.): 006000
Package size (for SID Gener.): 100000
Task handling (for SID Gener.): Backgr Process
Server group (for SID Gener.): No Server Group Configured
Activation started (process is running under user *****)
Not all data fields were updated in mode "overwrite"
Data package has already been activated successfully (will be skipped)
Process started
Process started
Process started
Process started
Process started
Import from cluster of the data package to be activated () failed
Process 000001 returned with errors
Process 000002 returned with errors
Process 000003 returned with errors
Process 000004 returned with errors
Errors occured when carrying out activation
Analyze errors and activate again, if necessary
Activation of M records from DataStore object CRACO20A terminated
Report RSODSACT1 ended with errors
Job cancelled after system exception ERROR_MESSAGE

Advertisement

Replay

Thanks for the link TSharma I will try that today.
UPDATE:
I ran a non-parallel Data Pump and just let it run overnight. This time it finished after 9 hours.  In this run I set the STATUS=300 parameter in the PARFILE which basically echos STATUS updates to standard out every 300 seconds (5 minutes).
And as before after 2 hours it finished 99% of the export and just spit out WAITING status for the last 7 hours until it finished.  The remaining TABLES it exported (a few hundred) were all very small or ZERO rows.  There clearly is something going on that is not normal.  I've done this expdp before on clones of this database and it usually takes about 2-2.5 hours to finish.
The database is about 415 Gigabytes in size.
I will update what the TRACE finds and I'm also opening a case with MOS.

View 4 Replies

Tags:

  1. labview daqパルス出力
  2. will z10 pair with ive-w530
  3. wifi no pasward janva ni app
  4. set cfl in udf text box in sap
  5. sattellite l650 1mm system unit psk1 je
  6. itunes login createSession
  7. sap po update ekpo upon save
  8. centers2k
  9. notp8z
  10. grainoh6
Copyrights 2019 Fcffair BigData Resource, All rights reserved