Job fail with Timeout for parallel process (for SID Gener.): 006000

Advertisement
November 30

Hello all,
Im getting below error and not able to find any issue with Basis side. Please anyone help on this!
Job started
Data package has already been activated successfully (will be skipped)
Process started
Process started
Process started
Process started
Process started
Import from cluster of the data package to be activated () failed
Process 000001 returned with errors
Process 000002 returned with errors
Process 000003 returned with errors
Process 000004 returned with errors
Background process BCTL_4XU7J1JPLOHYI3Y5RYKD420UL terminated due to missing confirmation
Process 000006 returned with errors
Data pkgs 000001; Added records 1-; Changed records 0; Deleted records 0
Log for activation request ODSR_4XUG2LVXX3DH4L1WT3LUFN125 data package 000001...000001
Errors occured when carrying out activation
Analyze errors and activate again, if necessary
Activation of M records from DataStore object CRACO20A terminated
Activation is running: Data target CRACO20A, from 1,732,955 to 1,732,955
Overlapping check with archived data areas for InfoProvider CRACO20A
Data to be activated successfully checked against archiving objects
Parallel processes (for Activation); 000005
Timeout for parallel process (for Activation): 006000
Package size (for Activation): 100000
Task handling (for Activation): Backgr Process
Server group (for Activation): No Server Group Configured
Parallel processes (for SID Gener.); 000002
Timeout for parallel process (for SID Gener.): 006000
Package size (for SID Gener.): 100000
Task handling (for SID Gener.): Backgr Process
Server group (for SID Gener.): No Server Group Configured
Activation started (process is running under user *****)
Not all data fields were updated in mode "overwrite"
Data package has already been activated successfully (will be skipped)
Process started
Process started
Process started
Process started
Process started
Import from cluster of the data package to be activated () failed
Process 000001 returned with errors
Process 000002 returned with errors
Process 000003 returned with errors
Process 000004 returned with errors
Errors occured when carrying out activation
Analyze errors and activate again, if necessary
Activation of M records from DataStore object CRACO20A terminated
Report RSODSACT1 ended with errors
Job cancelled after system exception ERROR_MESSAGE

Advertisement

Replay

Thanks for the link TSharma I will try that today.
UPDATE:
I ran a non-parallel Data Pump and just let it run overnight. This time it finished after 9 hours.  In this run I set the STATUS=300 parameter in the PARFILE which basically echos STATUS updates to standard out every 300 seconds (5 minutes).
And as before after 2 hours it finished 99% of the export and just spit out WAITING status for the last 7 hours until it finished.  The remaining TABLES it exported (a few hundred) were all very small or ZERO rows.  There clearly is something going on that is not normal.  I've done this expdp before on clones of this database and it usually takes about 2-2.5 hours to finish.
The database is about 415 Gigabytes in size.
I will update what the TRACE finds and I'm also opening a case with MOS.

View 4 Replies

The parallel process for mrp.

November 30

hi exports we plan to do the scope of planning for the total planning as a background job. while doing that system ask for the parallal processing for mrp what is customize step and procedure to do the parallel process for mrp.Dear Raj, With the help

View All Replies

Regenerate Variants for parallel processing in FI-CA

November 30

Hi everybody, does anybody know a possibility to regenerate variants for parallel processing objects (GPART for example) in FI-CA automically in a job? I can start the program RFKKDI05 with a variant but I can not tell the program to automatically re

View All Replies

Java Proxy Generation not working - Support for Parallel Processing

October 11

Hi Everyone, As per SAP Note 1230721 - Java Proxy Generation - Support for Parallel Processing, when we generate a java proxy from an interface we are supposed to get 2 archives (one for serial processing and another suffixed with "PARALLEL" for

View All Replies

In perfdatasource querying for global snapshot failed with error 'the size limit for this '

November 30

I received  scom alerts from two win 2k8 r2 servers , hosting exchange 2010 mailbox roles , the alerts came almost in same time from both servers , can I ignore those alerts or can someone give a me a clue how can I troubleshoot those alert , please

View All Replies

SQL Server Agent job fails with error : The package execution returned DTSER_FAILURE (1).

November 30

Copyright (C) Microsoft Corp 1984-2005. All rights reserved. Started: 10:00:01 AM Error: 2014-08-15 10:00:07.20 Code: 0xC0047062 Source: Data Flow Task LEAN [6761] Description: Teradata.Client.Provider.TdException: [Teradata Database] [3006] Logons a

View All Replies

Parallel Processing for BI Load

November 30

Hi All, I have a datasource which i migrated from BW 3.x to BI 7 . I am loading the data from datasource to ODS . In the DTP -> Execute tab i can see only 'Serial Extraction and processing of source package' . I Think because of this i am not able to

View All Replies

Parallel Processing for a single Package

November 30

Hi, I have PKg1 that have mixture of For Each Loop container, DFT's and Seq containers and I want to run more than one thread for this package where i can process data in parallel. Please let me know how i can create this using SSIS 2012. Thanks,Hi,

View All Replies

Completing the block step for parallel processing

November 30

Hello , I"m  using a  ParForEach  block   . It works fine and  2   approves get their decision task  respectively , I  want to end all parrallel  processes if one of the   approvers select the reject  option  . I  thought it could be done using the 

View All Replies

Issue in completing the block step for parallel processing

November 30

Hi, i have created a workflow where in i have used a block step to send workitems to multiple agents.  I have used parallel processing in block step. Number of agents are determined in the runtime. Lets say i have two items in my multiple line contai

View All Replies

Date range for archive process for infotype

November 30

Hello All, My User wants to remove  employee information in info type for terminated employees, so we decided to go for archive process but basis team is asking for date range. Can anyone suggest me how to give date range, even to provide to-date una

View All Replies

Hi preventing parallel processing for a program treating open dataset

November 30

Hi Has anyone come into a situation where he had to do an inbound interface (i.e using open dataset by scanning all the file in AL11) how do you treat program running in parallel in this situation. what i mean is that if the same program is doing an

View All Replies

Query for parallel process

November 30

Hi, I want to find that on which table paralle process is enable . By which dictionary view I can find it?See if this helps SQL> create table t parallel   2  as   3  select level no   4    from dual   5  connect by level <= 10   6  / Table created.

View All Replies

DB13 Job fail with error :Database instance is shut down

November 30

Hi All, Recently we upgraded our Redhat Linux, Database from 9i to 10.2.0.4 and SAP Kernel 640 to patch 347. Now my system is working fine but in DB13 jobs I am getting error: Job started Step 001 started (program RSDBAJOB, variant &0000000000763, us

View All Replies

OEM12c jobs fail with "Error attempting to invoke console command"

November 30

Hi gurus, I'm wondering if someone could help me on this issue. When I try to execute a job it remains in "Running" state for a long time periord and looking at the jobs details I can see something like this: Execution: DB11G.WORLD      DB11G.WO

View All Replies

Import job failes with ORA-01403: no data found ORA-06512: at "SYSMAN.MGMT

October 11

Hello everyone, I need a help on importing data from a schema in server 1 to the same schema in server 2 via network link. I receive following error when I try to submit a job on Enterprise Manager: Import Submit Failed ORA-01403: no data found ORA-0

View All Replies

Dedup job fail with 0x8056530c

November 30

I have a 2012r2 box, enabled dedup, Hyper-V role, but when i use powershell Start-DedupJob -Type Optimization -Volume d: the task fail like this: PS C:\Windows\system32> Start-DedupJob -Type Optimization -Volume d: Start-DedupJob : MSFT_DedupVolume.V

View All Replies

Archive Backup job failing with no error

November 30

Hi All, Can anybody help me to fix the backup issue. please find the rman log below and help me to fix this. Script /opt/rman_script/st80_oracle_arch.sh ==== started on Fri Jun 28 11:05:11 SGT 2013 ==== RMAN: /OraBase/V10203/bin/rman ORACLE_SID: ST80

View All Replies

Reporting (Project Publish) job is failing with 'The given key was not present in the dictionary'

October 11

I am using Project Server 2010 with SQL Server 2008 R2. I have a PWA Instance which was running fine. I have a big number of projects and I do not keep site for all the projects as we do not need project site in our business. Everything was running f

View All Replies

How many processes for Start processes

November 30

Hi Community,                         I am new to process chains, I am creating process chains for master data loading. Here I am adding " Execute Info Package " for every Object.After adding 10 different objects system not allowing me to add ne

View All Replies

Tags:

  1. hp 2000-2313tu clean install os
  2. 1020dead soulision
  3. sims resource wont download pdf files
  4. illustrator cs3 initialization crash
  5. hp omni 10 touch bloccato
  6. hp g60 diskpart uefi
  7. me22n save enhancement
  8. itunes login createSession
  9. CL_SQL_RESULT_SET=============CP
  10. DAQmx_Val_ChanPerLine
Copyrights 2019 Fcffair BigData Resource, All rights reserved